“Norwin A/S with the support of Sustainable Planning and Development successfully installed a Class 1 NORWIN 225 kW wind turbine on a 40 meter mono pole tower in Dominica.

The wind turbine is installed at Rosalie Nature Resort Facility where it will offset the high cost of energy from the utility and supply energy to the grid when excess is generated. The wind turbine is expected to generate 586,000kWh of clean energy per year offsetting 160 metric tons of CO2 emissions per year.”